HYDROLOGIC UNIT CODE BOUNDARIES (HUC), 1998
SCOPE OF WORK
PROPOSED
ACTIVITIES
The Contractor will:
1. Provide all necessary
personnel, equipment, and facilities required to produce 8, 10, and 12-digit
Hydrologic Unit Code (HUC) boundaries to NRCS and USGS-WRD standards in ESRI=s Arc/Info format. Project specific tasks for each basin are as follows:
Task 1: Selection of Watershed
& Sub-watersheds
$
Designate 10-digit Watershed boundaries on 1:500k
$
Review, revise, obtain consensus on 10-digit HU's
$ GIS
Preparation & production of 1:100k or 1:200k maps
$
Designate 12-digit boundaries on 1:200k
$
Review, revise, obtain consensus
$
Facilitate GIHUG Review, revise maps, get consensus
$
Assign 10- and 12-digit HU codes
Task 2: Delineate watershed and sub-watershed
boundaries on 1:24k maps; color code boundaries; check each map.
Task 3: Develop Digital GIS
Coverage of HUC-boundaries
$
Manually digitize or trace and scan all boundaries
$
Attribute polygons with HU codes and arcs with HU level
$
Join, edge match, and develop single GIS coverage
$
Document coverage, and colleague review
$
Release ARC/INFO and ARC VIEW coverages
2. Provide completed HUC
datasets to the Georgia GIS Data Clearinghouse for review and acceptance.
3. Adhere to the AGeographic Information Systems Standards and
Guidelines for the State of Georgia.@
4. Adhere to the methods and
criteria for hydrologic unit selection and delineation published in the Draft
Interagency Standard for Hydrologic Unit Mapping and in the Natural Resource
Conservation Service (NRCS) National Instruction 170-304, AMapping and digitizing watershed and
subwatershed hydrolgic unit boundaries,@ first issued in July 1992.
5. Submit quarterly progress
reports summarizing base map activities.
The ITPC will:
1. Provide to the Contractor on
request current versions of all relevant standards.
DELIVER SCHEDULE
|
HUC Basin(s) |
Delivery Date |
|
Chattahoochee & Flint |
March 31st, 1998 |
|
Oconee |
June 30th, 1998 |
|
Coosa & Tallapoosa |
December 31st, 1998 |